Carry out the Supervision of the Detailed Design and Construction of the El TablóN Multipurpose Dam and Annexed Works.
3.2 the Executing Agency Makes Available to Interested Parties All Documentation Related to this Tender, Necessary for the Preparation of the Proposals. This Information will be Available at:
Location: [email protected]
From: 28-Mar-2025
Until: 28-Mar-2025
[Disclaimer: The above text is machine translated. For accurate information kindly refer the original document.]
Address: Special Unit for Renewable Energy Projects (Ueper), of the National Electric Energy Company (Enee), Government Civic Center, 6th Floor, Building Body Lower "C"
Country: Honduras
Email: [email protected]